📐 Free Tool

Office Fit-Out Budget Calculator

Get an instant cost estimate for your office project in Pune or Mumbai. Takes 60 seconds. No sales call required. Your estimate appears immediately.

1

How much space?

Not sure? Typical team of 100 = 10,000–14,000 sq ft (India norms)

2

What finish grade?

3

Which city?

Mumbai projects typically carry 10–15% uplift for logistics and labour.

4

When do you need it?

Rates updated 2026 Based on actual project cost data from 35+ Pune and Mumbai offices delivered since 2019.
Fixed-price delivery Every Vektor project is quoted at a fixed total. No per-item billings, no scope creep surprises.
Your estimate is private We don't share your details. You'll get a one-time email with a PDF summary and nothing else.
Your Estimate
Total budget range
.
Enter area above to see estimate
Civil & structural works .
MEP (electrical, HVAC, plumbing) .
Interior finishes & millwork .
Furniture (FF&E) .
AV & smart tech .
Design & project management .
Contingency (10%) .

Get your full breakdown by email

Enter your work email and we'll email a PDF summary with category-by-category breakdown, timeline estimate, and 3 comparable projects.

We'll only send you this PDF. No sales calls unless you ask. Privacy Policy

Use the estimate as a planning range

The calculator is an early planning tool, not a quotation. A project budget changes with area, shell condition, MEP capacity, furniture, joinery, acoustic requirements, technology, approvals, building rules, finish level, and the amount of work required outside the tenant area. Treat the output as a conversation starter and keep a margin until the scope has been surveyed and specified.

For a more useful next step, save the assumptions behind the estimate and share them with the Vektor Spaces team. They can help identify missing scope, sequencing risks, and the information needed before a fixed-price proposal is possible.

Why two offices with the same area can cost differently

Area is only one input. A warm-shell floor with usable landlord infrastructure may need a different scope from a bare shell. A client-facing headquarters may prioritise meeting rooms and finishes, while a technology workplace may carry more power, data, acoustic, and collaboration requirements. Furniture, access control, AV, fire systems, HVAC changes, approvals, logistics, and programme pressure can each move the budget.

Write down the assumptions behind every early estimate. When those assumptions change, update the range instead of treating the first number as a promise.