Where Global Capability Centres Come to Life.
Turnkey GCC office builds in Pune and Mumbai. Fixed price. Global-HQ standards. Delivered on time.
One team. Design to handover.
No vendor coordination, no budget drift. A single accountable partner from brief to keys.
Why GCCs choose Pune & Mumbai.
India's two premier GCC destinations — each with a distinct talent base, Grade-A commercial stock, and a cost profile that makes the business case easy to defend to global leadership.
Talent Depth
Pune's 600K+ IT and engineering workforce anchors technology and shared-services GCCs. Mumbai's financial services cluster — BKC, Powai, Navi Mumbai — draws banking, insurance, and global markets functions. Both cities give you access to the talent pipeline at scale.
Grade-A Commercial Stock
Hinjewadi, Kharadi, Magarpatta, and Baner in Pune. BKC, Lower Parel, Powai, and Navi Mumbai on the western side. Both cities have an expanding supply of Grade-A commercial buildings with the floor plates, MEP infrastructure, and sustainability ratings your global procurement team expects.
Cost Efficiency
A 40–60% cost advantage over Singapore or London fit-outs — at equivalent specification. GCCs operating with global-HQ design standards no longer need to pay global-HQ build costs. You get the same brief executed at a fraction of the price, without compromise on quality or certification path.
What makes a GCC fit-out different from a standard office build.
GCCs carry a different set of constraints — and most design-build firms aren't structured to handle them. Here's what we've built our process around.
Global brand compliance alongside local interpretation
We work directly from your global brand standards deck. Our concept phase produces a design that passes HQ sign-off and still feels right for the city it's in — not a copy-paste of the London office dropped into Kharadi.
Multi-stakeholder signoff across geographies
Global procurement, regional IT, local facilities, international D&I standards — we produce 3D walkthroughs, detailed BOQs, and compliance documentation that gives every stakeholder what they need to sign off, without slowing the programme.
WELL, LEED, or IGBC certification path
Certification documentation is built into the construction process, not retro-fitted at the end. We track compliance against WELL Building Standard, LEED v4.1 BD+C, and IGBC Green Interiors criteria throughout the build, so your third-party assessor walks into a prepared file — not a blank spreadsheet.
Phased expansion provisions: fit-out today, scale tomorrow
GCCs grow. Every project we design includes future-proofed MEP zoning, demountable partitioning, raised-floor cabling routes, and headcount-growth space plans. Adding 30% more desks in 18 months should not require a full re-fit. Ours don't.
The Vektor GCC process — six steps, one team.
Adapted specifically for global capability centres: every phase is designed to produce the stakeholder-ready output you need at that moment, without adding programme time.
Global Brief Intake
Stakeholder alignment workshop, brand standards review, global procurement requirements capture, D&I checklist, IT and AV brief. All inputs resolved before a line is drawn.
Site Assessment & Local Compliance Check
Building authority NOC requirements, landlord fit-out guide review, MEP capacity audit, fire NOC pathway, floor plate survey. We map every constraint before the concept phase begins.
Concept Design + 3D Walkthrough
Full 3D walkthrough produced to global-HQ sign-off standard. Includes brand compliance mark-up, compliance notes against WELL/LEED criteria, and a written design rationale for procurement review.
BOQ & Fixed-Price Contract
Line-itemed Bill of Quantities, formatted for global procurement approval. Fixed price, fixed scope, fixed timeline. No surprises for your global finance team mid-build.
Build & Quality Execution
Single site PM, daily progress reports, weekly executive summary for global stakeholders, MEP commissioning, AV and smart-building integration, ISO 45001-aligned site safety management.
Handover, Certification Docs & 90-Day Support
Formal handover pack including as-built drawings, MEP commissioning records, WELL/LEED documentation file, warranties, and 90-day post-occupancy support. You're operational from day one.
Projects that speak to the GCC brief.
Enterprise-grade offices delivered at pace — the same standards a global capability centre requires.
Marathon Futurex
A board-ready enterprise headquarters in Lower Parel — ceremonial spine, two flexible team floors, 120-seat town hall, and full smart-building integration. Delivered in 72 working days inside a live high-rise tower.
Techila Networks
A high-specification technology office in Magarpatta City, Pune. Collaborative open floors, fully integrated AV, and a design language built to scale — completed in 40 working days from signed contract.
Certifications & standards built into every GCC project.
Global procurement teams and corporate real estate leads expect documentation to a recognised standard. We build compliance tracking into the construction process — not as an afterthought.
Certification is issued by an independent third-party assessor engaged directly by your team. We prepare and deliver all the construction documentation required to achieve certification-readiness — so you walk into the assessment process with a complete file.
Questions we hear from GCC real estate and procurement teams.
Ready to plan your GCC workspace?
Tell us about your site, timeline, and headcount. We'll come back with a fixed-price build plan, a 3D walkthrough, and a delivery schedule — usually within 5 working days.